Traceability Audit Prep

Run this checklist the week before the auditor arrives. It catches the issues that typically delay an audit by days — incomplete matrices, stale connectors, unverifiable hash chains, access-control gaps — when fixing them before the auditor sees them takes hours. Applies whether the auditor is external (notified body, certification body) or internal (QA leadership, customer compliance team).
Roboticks is audit-readiness tooling, not a certified toolchain. We assemble the evidence your notified body, certification body, or QA process ingests. We do not replace tool qualification (DO-178C, ISO 26262-8 TCL) and we do not issue conformity assessments. Verify the regulatory interpretations on this page against the standard text and your accredited assessor.

When to run

The checklist

1. Matrix completeness

  • Open the traceability matrix for the release under audit.
  • Filter to uncovered requirements. Each one is a potential audit finding.
  • For each uncovered requirement: either add a confirming test or document as acknowledged gap with rationale.
  • Filter to failing tests on the release. Each is a potential audit blocker.
  • Filter to requirements with only failed tests confirming them. These count as uncovered for audit purposes — close them.

2. Acknowledged gap rationale

  • List every acknowledged gap in the release.
  • Confirm each has documented rationale visible in the requirement record.
  • Confirm the rationale is defensible to the auditor — “we’ll get to it” is not a rationale; “this clause does not apply to our product class because…” is.
  • Get sign-off from the safety engineer or compliance lead on safety-typed acknowledged gaps.

3. Requirement snapshotting

  • Confirm the release is in verified or shipped state (snapshots are taken at verified transition).
  • Confirm every requirement in the snapshot has a derives_from referencing a pinned standard (where applicable to your project — purely internal requirements may legitimately have an empty derives_from).
  • Confirm derives_from references the correct edition of each standard — not an obsolete one.

4. Evidence-pack integrity

  • Generate the evidence pack for the release if not already generated:
  • Verify the hash chain:
    Both should pass with no errors. A verification failure must be resolved before the audit.
  • Open the PDF and skim. The cover page, table of contents, requirements section, and disclaimer should all render correctly. Customised templates (Enterprise) should render with the correct branding.
  • Confirm any MCAPs the auditor might want are either in hot storage (90-day window) or that you have time to restore from Glacier (Standard: 9–12 hours; Bulk: 48 hours — see Archive).

5. Connector configuration review

  • List active BYO connectors for the project.
  • Confirm each connector last ran successfully within the last 24 hours. A connector that broke after the most recent verification leaves stale data in the pack.
  • For Polarion / Jama / codeBeamer / DOORS connectors: confirm the requirement-snapshot import matches the version in the upstream system at release-cut time.
  • For LDRA / Polyspace / Coverity: confirm SARIF output is current and present in the pack.

6. Standards-feed posture

  • List pinned standards and check for open amendment alerts not yet triaged.
  • For any open amendment: either complete triage before the audit, or document the open alert with a triage plan and target date.
  • Auditors often check the feed posture as a signal of overall hygiene; un-triaged amendments are a soft warning sign.

7. Access controls

  • Review project member list. Remove members who no longer need access.
  • Review read-only share links for the release. Revoke any that have served their purpose.
  • Generate a fresh read-only share link for the auditor with a sensible expiry (default 90 days; extend to 180 if your audit cycle is slow).
  • Test the share link from a fresh browser session to confirm it works and scopes correctly.

8. Sign-off records

  • If your release-state machine requires sign-off, confirm every required sign-off is recorded.
  • Each sign-off should have a name, role, timestamp, and (recommended) comment.
  • For external audits: confirm the comment quality — “approved” is weak; “approved with awareness of acknowledged gap REQ-217 per safety engineer assessment dated YYYY-MM-DD” is auditable.

9. Risk-assessment linkage

  • Confirm hazards.yaml is current and consistent with the safety engineer’s risk-assessment narrative.
  • Confirm every hazard has at least one mitigating requirement (realised_by_requirements).
  • For any hazard without mitigation: confirm the risk assessment documents why (e.g., risk acceptable without further mitigation, or mitigation is purely procedural and lives in instructions for use).

10. Cover letter and handoff

  • Draft the cover letter from the template (see Customer handoff).
  • Edit for the specific auditor and audit scope.
  • Confirm the disclaimer is present.
  • Prepare the pack-delivery method (signed share link, secure file transfer, in-person delivery).
  • Brief the engineers who will be in the audit room. They should know which sections of the pack to point to for which questions.

Post-audit hygiene

After the audit:
  • Record audit findings (if any) as work items in the project.
  • Schedule re-verification for any findings that require fix-and-re-verify.
  • Update the rationale on any acknowledged gaps the auditor scrutinised (the auditor’s questions are useful input).
  • Revoke the auditor’s share link if they no longer need it (or extend if the audit is incomplete).
  • Retain the audit findings document alongside the evidence pack — they belong together in the 10-year archive.

Common audit-blocker patterns

Things that surprise teams during audits and cause delays:

Next steps

Customer handoff

The cover letter and delivery mechanics.

Hash chain verification

What the auditor will check on integrity.

Standards feed

Amendment-triage hygiene.

Change-impact workflow

The day-to-day discipline that prevents most pre-audit fire-drills.